Transcript text: A construction crew needs to pave a road that is 205 miles long. The crew paves 8 miles of the road each day. The length, $L$ (in miles), that is left to be paved after $d$ days is given by the following function.
\[
L(d)=205-8 d
\]
Answer the following questions.
(a) How many miles of the road does the crew have left to pave after 12 days? $\square$
miles
(b) If 141 miles of the road is left to be paved, how many days has the crew been paving the road? $\square$
days