Questions: It takes two electricians nine days to rewire 2 identical houses. How long will it take 3 electricians to rewire 3 of the same houses at the same rate?
Transcript text: It takes two electricians nine days to rewire 2 identical houses. How long will it take 3 electricians to rewire 3 of the same houses at the same rate?
Solution
Solution Steps
To solve this problem, we need to determine the rate at which the electricians work and then use that rate to find out how long it will take a different number of electricians to complete a different number of houses.
Calculate the rate at which the two electricians work together.
Use this rate to determine the time it would take for three electricians to rewire three houses.
Step 1: Calculate the Rate at Which Two Electricians Work Together
Given:
\(2\) electricians
\(9\) days
\(2\) houses
The rate at which the two electricians work together is:
\[
\text{Rate per day} = \frac{\text{houses}}{\text{days}} = \frac{2}{9} \approx 0.2222 \text{ houses/day}
\]
Step 2: Calculate the Rate per Electrician
The rate per electrician is:
\[
\text{Rate per electrician} = \frac{\text{Rate per day}}{\text{number of electricians}} = \frac{0.2222}{2} \approx 0.1111 \text{ houses/day}
\]
Step 3: Calculate the Total Rate for Three Electricians
Given:
\(3\) electricians
The total rate for three electricians is:
\[
\text{Total rate for 3 electricians} = \text{Rate per electrician} \times \text{number of electricians} = 0.1111 \times 3 \approx 0.3333 \text{ houses/day}
\]
Step 4: Calculate the Time to Rewire Three Houses
Given:
\(3\) houses
The time it will take for three electricians to rewire three houses is:
\[
\text{Time} = \frac{\text{houses}}{\text{total rate}} = \frac{3}{0.3333} \approx 9.0 \text{ days}
\]